The location where the entire operation is planned is situated in the town of Sali on Dugi Otok (Long Island), in the area extending from the existing customs pier on the northeastern side of the bay towards the southeast. The purpose of the subject structure is for infrastructure use in the transportation system (maritime transport) and it complies with the conditions defined in spatial planning documentation.
The following works are planned at the subject location:
- Construction of a shoreline with a total length of 149.5 meters or a net mooring line length of 141.5 meters.
- Arrangement of the hinterland area behind the newly constructed shoreline.
- Construction of the main breakwater for wave protection with a total length of 116 meters.